Skip to main content

Posts

Showing posts with the label N scale

Ballasting The C&NW Layout

After watching plenty of videos on YouTube on ballasting N scale and specifically KATO Unitrack, it was now time to get it done on my C&NW layout. Growing up and attempting previous model railroads, ballasting was always an issue for me, but with the help of the internet, I think I finally got it right. There are plenty of YouTube videos on it now and I elected to go with the following approach. Items needed: Ballast White Glue Isopropyl Alcohol Scenic Cement Baby Spoon Craft Paint Brushs Eye Droppers Steps: I applied Elmer’s Glue-All full strength (white glue) on the edges of the Unitrack and a little on the trackboard. With a craft flat paint brush, I spread the glue evenly. I used a baby spoon to distribute the ballast over the edges of the track.  The baby spon allowed a bit more control to apply the ballast. With a fine paint brush, I cleaned up any ballast that was built up on the ties. With a wider flat paint brush, I brushed up at an angle any ballast on the track board...

Buildings For The C&NW Layout

First off, Happy Thanksgiving! It was another good day for me yesterday with USPS.  A lot more packages started to come in from Ebay and Facebook purchases.  A bunch of the N scale buildings I will be using for the city started coming in.  I am still waiting on a few more, but from the looks of it, I may run out of room in the city.  My plan for the city may have to slide more into my suburban area.

Michigan City Swap Meet...Recap

Now that I am ready to start to add some buildings and terrain to my layout I decided to hit up a swap meet in Michigan City, IN today to see if I can get lucky.  My goal was to mainly shop for N scale buildings first, then anything that I could find that was C&NW related. Majority of the vedors that were on hand were selling HO scale and Lionel.  I knew that getting into N scale I would have a harder time finding items, but I really do like the look of N scale over HO, I am probably in the minority but I feel N scale actually has more detail than HO scale. I did an initial pass of all the vendor tables and did find two C&NW boxcars along with a N scale Freight Depot building all for $20, so I was pretty happy so far.  I decided to go and double back now and search more throughly to see if I could find anything else.  I cam across a C&NW gondola car, another N scale Soda Shoppe building, then buried under a lot of boxes, I found a KATO Chicago METRA Galle...

Deciding On An Era For The Layout

The past few days I have been contemplating on an era for my N scale layout.  Originally I was planning on just doing a make shift layout so I could run any engine/cars that I wanted too, but the more and more I thought about it, I realized choosing an era I think would be more fun to build and collect. As I mentioned in an  ealier post , I grew up right next to the old Chicago & Northwestern (C&NW) West Line heading out of Chicago and have very fond memories of seeing the trains bearing the C&NW logos on them while playing ball in the streets and picking up my father from the train station.  So I thought to myself that is what I want to model, the C&NW pre-1987.  Why pre-1987 you might ask, 1987 is when they opened the new Ogilvie Transportation Center in downtown Chicago that the C&NW/Metra Commuter trains termiinated at.  The previous station that was torn down was known as Northwestern Terminal. Original Northwestern Terminal Now bac...

First Test Of DCC With A F40PH 2016 ONP

After I got the track all wired last night, I had to do a test with DCC.  When I first laid down the track I had done a test with DC, but this was going to be the first with DCC and my new decoder in the engine. When I made my initial track purchase, I added the KATO 2016 Operation North Pole Christmas Train to my order, along with a DCC decoder from TCS (model K5D7).  I grew up right next to the old C&NW West Line which then became the Metra West Line, so seeing and riding the Bi-Level passenger cars on an every day basis, I knew I had to have these for my layout. . KATO 2016 Operation North Pole Christmas Train TCS K5D7 A few days ago I installed the DCC decoder and now it was time for the inital test with DCC power.  I took a glance at the manual for my NCE Power Cab in advance, so I knew what I had to do in order to program the decoder to a 4 digit address.  It is recommended to leave the 3 digit address at “3” and program the 4 digit addr...

Time For Expansion, Already?

After staring at the track layout for 2 days and then discussing it with the wife to get her opinion, I decided to already do an expansion to the existing “Manning Oaks” layout.  I was not very fond of the idea of a ‘dead end’ track, and seeing that I had 2 loops and half of a 3rd loop, I thought why not have the ability to have 3 loops.  Once all the wiring is completed I will be running DCC on this track (with also the ability to run DC) and one of the benefits of running DCC is to be able to control multiple trains at different speeds.  Also one of the reasons for building this layout is just to be able to watch the trains run.  So by adding a 3rd loop I can have the enjoyment of watching 3 trains go around the track without having to work any of the turnouts. I put my existing “Manning Oaks” track layout into a program called SCARM, and then I was able to remove the pieces that I no longer was going to use and add the pieces I needed to complete the 3rd loop, I c...

Let’s Hide Some Wires

After waiting for my wife to arrive home from work last night (I wanted to show her a test run) it was time to start and hide some of the wiring.  The track was traced with pencil (good thing I went with the light brown paint, the pencil marks were very easy to see) and I commenced on drilling some holes under the track.  Below each of the turnouts needed a hole, and I needed 5 more holes for the power feeds.  I have 4 power feeds under the double crossing and 1 more across on the other side. Once I fed all the wiring through the holes, I also began to secure the track to the trackboard with screws.  My plan with this layout is to be able to move it off the bar if the need arises. As of right now, I am quite happy on how it is turning out.

Let The Fun Begin, Laying Out The Track

This morning it was time to start laying out the track and hoping that everything fits together.  It was great to be able to follow the “Manning Oaks” layout that I got from the KATO USA website, having the product number of all the track pieces made it a breeze. Track pieces all organized.. Track pieces all organized . It took me about an hour to lay all the track pieces on the board, and then maybe about another 30 minutes to hook up the temporary wiring.  For now I just wanted to get the track quickly wired up so we can do a test run. Once it was wired up, it was time for the test.

Deciding On A Layout

Knowing that I wanted to use KATO Unitrack for my model railroad track I went and visted the website at  katousa.com  to see what kind of layouts they have.  I wanted to use as much space as possible on top of my bar, yet if need be, be able to move the layout and re-use the bar.  I brought my youngest son (now 12) down to take a look and get his opinion.  I was not into just doing a switching layout, I wanted to enjoy watching the train go around, but also play with some switches occasionally.  I came across a layout called “Manning Oaks” and thought it would be perfect.  The layout was designed to fit on a 36”x72” board and that would fit perfectly on my bar.  It provided 2 full loops where I can watch the trains go around and some turnouts to be me more involved with the layout.

Welcome to Coloma Rails

Welcome to “Coloma Rails”, the plan for this blog will be to document my process of building a N Scale model railroad using KATO Unitrack. All my life I have always wanted a model railroad layout, and have tried on numerous occasions.  Majority of my issues have been space, or we ended up moving to a new location and I never finished a layout. As a child, I could not have a permanent layout in my parents house, so when I became an adult it was time to finally get a layout. I first started when I was 21 with N scale and like now, with KATO Unitrack.  I chose N scale at the time since my plan was to build the layout on a shelf system.  The shelves were built and the track was laid and then I moved. My second time at the hobby was a couple years later and I thought I may have a spare bedroom.  This time I was going to build in HO scale.  I purchased all the lumber to work on the benchwork and completed most of the assembly to find out my wife was pregnant w...